Major sidewalk repairs are continuing in the downtown area. This week, a new, permeable paver sidewalk was installed along Ocean Avenue fronting Devendorf Park. This sidewalk replaces the non-permeable brick sidewalk that had shifting due to tree roots and water damage. City staff has been impressed with the fine level of craftsmanship demonstrated by the contractor’s crew. Check it out!

Our New Sidewalk